[1] |
Mao Baohua.Discussions on the framework of coordination theory of transportation systems[J].Systems Engineering,1994,12(4):5458.(in Chinese)
|
[2] |
Lin Boliang,Hu Anzhou.Fuzzy integer programming model to determine optimal utilization of available capacity resources for rail network[J].Journal of the China Railway Society,1997,29(4):915.(in Chinese)
|
[3] |
Xue Feng, Luo Jian. Dynamic coordination relationship between Marshalling station capacity and train diagram capacity[J].Railway Transport and Economy,2008(7):7679.(in Chinese)
|
[4] |
Zhu Xiaoli,LI Xiamiao.Research on the matching and coordinating relationship of the declassification system in marshalling station on trunk line with increased speed[J].China Railway Science,2004,25(4):112115.(in Chinese)
|
[5] |
Zhu Xiaoli,Li Xiamiao.The matching and coordinating relationship of the departure subsystem in marshalling station on trunk line with increased speed[J].China Railway Science,2006,27(5):118121.(in Chinese)
|
[6] |
He Shiwei, Song Rui, Yang Hao. Study on influence of trains’ speed increasing on the operations of marshalling station[J].Journal of the China Railway Society,2000,32(5):612.(in Chinese)
|
[7] |
Deng Longbing.Study on coordinative optimization method of capacity between lines and stations within existing railway[J].Technology & Economy in Areas of Communications,2012(3):104107.(in Chinese)
|
[8] |
Guo Qianqian.The model and algorithm of train path connection based on wagonflow allocation of technical station[D].Chengdu:Southwest Jiaotong University,2012.(in Chinese)
|
[9] |
Szpigel B.Optimal train scheduling on a single line railway[J].Operations Research,1973,7(2):344351.
|
[10] |
Dorfman M J,Medanic J.Scheduling trains on a railway network using discreteevent model of railway traffic[J].Transportation Research Part B,2004,38(1):8198.
|
[11] |
Bai Yun,Chen Yao,Chen Yue,et al.Rescheduling of metro train timetable for delay reduction and equilibrium of trains’ arrival and departure[J].Journal of Transportation Systems Engineering and Information Technology,2014,14(3):104110.(in Chinese)
|
[12] |
Chen Dong, Peng Qiyuan, Li Yonghui. Simulation of trains’ arrival delay’s effect on wagon of flow connecting in technical station[J].Journal of Southwest Jiaotong University,2014,49(6):11081115.(in Chinese)
|
[13] |
Peng Yuqing,Hu Xiwen.Modified genetic algorithms for jobshop scheduling problems[J]. Computer Engineering & Science,2008,30(10):4850.(in Chinese)
|
|
附中文参考文献:
|
[1] |
毛保华.运输系统协调理论研究[J].系统工程,1994,12(4):5458.
|
[2] |
林柏梁,胡安洲.大规模铁路网上点、线运输能力协调利用的模糊整数规划方法[J].铁道学报,1997,29(4):915.
|
[3] |
薛锋,罗建.编组站能力与运行图能力的动态协调关系[J].铁道运输与经济,2008(7):7679.
|
[4] |
朱晓立,李夏苗.提速干线上编组站到解系统匹配与协调关系的研究[J].中国铁道科学,2004,25(4):112115.
|
[5] |
朱晓立,李夏苗.提速干线编组站出发子系统内部匹配与协调关系[J].中国铁道科学,2006,27(5):118121.
|
[6] |
何世伟,宋瑞,杨浩.列车提速对编组站运营工作的影响研究[J].铁道学报,2000,32(5):612.
|
[7] |
邓隆炳.既有铁路点线能力的协调优化方法分析[J].交通科技与经济,2012(3):104107.
|
[8] |
郭倩倩.基于车流匹配的技术站列车运行线接续模型及算法研究[D].成都:西南交通大学,2012.
|
[11] |
柏赟,陈垚,陈玥,等.考虑列车总晚点和到发均衡性的地铁列车运行调整方法研究[J].交通运输系统工程与信息,2014,14(3):104110.
|
[12] |
陈东,彭其渊,李永辉.列车到达晚点对技术站车流接续影响仿真分析[J].西南交通大学学报,2014,49(6):11081115.
|
[13] |
彭玉青,胡希文.改进的遗传算法在作业调度中的应用[J].计算机工程与科学,2008,30(10):4850.
|