[1] |
Werner S,Kellner M,Schenk E,et al. Justinsequence material supply—a simulation based solution in electronics production [J]. Robotics and ComputerIntegrated Manufacturing,2003,19(1):107111.
|
[2] |
Svensson G. Key areas,causes and contingency planning of corporate vulnerability in supply chains:A qualitative approach [J]. International Journal of Physical Distribution & Logistics Management,2004,34(9):728748.
|
[3] |
Thun J H,Marble R P,SilveiraCamargos V. A conceptual framework and empirical results of the risk and potential of just in sequence [J]. Journal of Operations and Logistics,2007,1(2):113.
|
[4] |
Boysen N,Fliedner M,Scholl A. Sequencing mixedmodel assembly lines:Survey,classification and model critique [J]. European Journal of Operational Research,2009,192(2):349373.
|
[5] |
Gujjula R,Günther H O. Rescheduling blocked workpieces at mixedmodel assembly lines with justinsequence supply [C]∥Proc of Asia Pacific Industrial Engineering & Management Systems Conference,2009:27582763.
|
[6] |
Gujjula R,Gunther H O. Resequencing mixedmodel assembly lines under justinsequence constraints [C]∥Proc of the International Conference on Computers & Industrial Engineering(CIE 2009), 2009:668673.
|
[7] |
Heinecke G,Lamparter S,Lepratti R,et al. Advanced supply chain information for rulebased sequence adaptions on a mixedmodel assembly line with unreliable justinsequence deliveries [C]∥Proc of Manufacturing Modelling,Management,and Control, 2013:19021907.
|
[8] |
Chen Zhiyong. Research on materials sequence supply of mixedmodel production based on manufacturing industry [D]. Changchun:Jilin University,2009. (in Chinese)
|
[9] |
Li Zeou. The research and application justinsequence module in ZF FAWER chassis technology Co.,Ltd [D]. Changchun:Jilin University,2012. (in Chinese)
|
[10] |
Guo Yandong,Wang Qing,Huang Min. Rescheduling with release time to minimize sum of waiting time considering waiting constraint of original loads [J]. Acta Automatica Sinica,2013,39(12):21002110. (in Chinese)
|
[11] |
Guo Yandong,Huang Min,Wang Qing. Rescheduling for rush jobs on single machine with loads locked original scheduling [J]. Journal of Northeastern University ( Natural Science),2013,34(5):628631. (in Chinese)
|
[12] |
Hyun C J,Kim Y,Kim Y K. A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines [J]. Computers & Operations Research,1998,25(7):675690.
|
[13] |
Fattahi P,Salehi M. Sequencing the mixedmodel assembly line to minimize the total utility and idle costs with variable launching interval[J]. The International Journal of Advanced Manufacturing Technology,2009,45(910):987998.
|
[14] |
Metropolis N,Rosenbluth A W,Rosenbluth M N,et al. Equation of state calculations by fast computing machines [J]. The Journal of Chemical Physics,1953,21(6):10871092.
|
[15] |
Kirkpatrick S,Vecchi M P. Optimization by simulated annealing [J]. Science,1983,220(4598):671680.
|
|
附中文参考文献:
|
[8] |
陈志勇. 基于制造业的混流生产物料顺序供应研究[D]. 长春:吉林大学,2009.
|
[9] |
李泽欧. 采埃孚富奥底盘技术 (长春) 有限公司准序化模式应用研究[D]. 长春:吉林大学,2012.
|
[10] |
郭艳东,王庆,黄敏. 就绪时间受限的负荷单机环境下返工工件重调度方法[J]. 自动化学报,2013,39(12):21002110.
|
[11] |
郭艳东,黄敏,王庆. 锁定初始调度的紧急工作单机重调度问题[J]. 东北大学学报(自然科学版),2013,34(5):628631.
|