[1]Tavares LV. A review of the contribution of operational research to project management [J]. European Journal of Operational Research, 2002,136(1):118.
[2]Zhang Jingwen, Xu Yu, He Zhengwen, et al. A review on the time/cost tradeoffs problem in project scheduling [J]. Journal of Industrial Engineering and Engineering Management, 2007, 21(1):9297. (in Chinese)
[3]De Reyck B. Scheduling project with generalized precedence relations:Exact and heuristic approach [D]. Leuven:Katholieke Universiteit Leuven, 1998.
[4]Brucker P, Drexl A, Mhring R, et al. Resourceconstrained project scheduling:Notation, classification, models and methods [J]. European Journal of Operational Research, 1999,112:341.
[5]Herroelen W,De Reyck B,Demeulemeester E.Resource constrained scheduling:A survey of recent developments [J]. Computers and Operations Research, 1998, 25:279302.
[6]Demeulemeester E, Herroelen W. Project schedulingA research handbook [M].Boston:Kluwer Academic Publishers, 2002.
[7]Patterson J. A comparison of exact procedures for solving the multiple constrained resource project scheduling problem [J]. Management Science, 1984, 30:854867.
[8]Demeulemeester E, Herroelen W. A branchandbound procedure for the multiple resourceconstrained project scheduling problem[J]. Management Science, 1992, 38(12):18031818.
[9]Kolisch R, Sprecher A, Drexl A. Characterization and generation of a general class of resourceconstrained project scheduling problems[J]. Management Science, 1995, 41(10):16931703.
[10]Demeulemeester E, Dodin B, Herroelen W. A random activity network generator [J]. Operations Research, 1993, 41(5):972980.
[11]Agrawal M K, Elmaghraby S E, Herroelen W S. DAGEN:A generator of test sets for project activity nets [J]. European Journal of Operational Research, 1996, 90(2):376382.
[12]Kolisch R, Sprecher A, Drexl A. Characterization and generation of a general class of resourceconstrained project scheduling problems[R]. Kiel, Germany, 1992.
[13]Kolisch R,Sprecher A.PSPLIBA project scheduling library [J]. European Journal of Operational Research, 1996, 96:205216.
[14]Schwindt C. A new problem generator for different resource constrained project scheduling problems with minimal and maximal time lags [R]. WIORReport449, Karlsruhe, Germany:Institut für Wirtschaftstheorie und Operations Research, Universitt Karlsruhe, 1995.
[15]Schwindt C.Generation of resourceconstrained project scheduling problems with minimal and maximal time lags [R]. WIORReport489,VKarlsruhe, Germany:Institut für Wirtschaftstheorie und Operations Research, Universitt Karlsruhe, 1996.
[16]Schwindt C.Generation of resourceconstrained project scheduling problems subject to temporal constraints [R]. WIOR Report543, Karlsruhe, Germany:Institut für Wirtschaftstheorie und Operations Research, Universitt Karlsruhe, 1998.
[17]Tavares L V.Advanced models for project management [M].Boston:Kluwer Academic Publisher,1998.
[18]Vanhoucke M, Demeulemeester E, Herroelen W. RanGen:A random network generator for activityonthenode networks [J]. Journal of Scheduling, 2003, 6(1):1334.
[19]Vanhoucke M,Coelho J,Tavares L,et al.An evaluation of the adequacy of network generators with systematically sampled networks [J]. European Journal of Operational Research, 2008, 187(2):521524.
[20]Gutiérrez M, Durán A, Alegre D, et al. Hiergen:a computer tool for the generation of activityonthenode hierarchical project networks [C]∥Proc of the Computational Science and Its Applications—ICCSA, Part III, Assisi, 2004:857866.
[21]Browning T R,Yassine A A.A random generator of resourceconstrained multiproject network problems [J]. Journal of Scheduling, 2010, 13(2):143161.
[22]Weglarz J. Project scheduling:Recent models, algorithms and applications[M]. Boston:Kluwer Academic Publisher, 1999.
[23]Deblaere F,Demeulemeester E,Herroelen W.Reactive scheduling in the multimode RCPSP[J]. Computers and Operations Research, 2011, 38(1):6374.
[24]Tian W,Demeulemeester E.On the interaction between roadrunner or railway scheduling and priority lists or resource flow networks [J]. Flexible Services and Manufacturing Journal, 2012, DOI:10.1007/s1069601291454.
附中文参考文献:
[2]张静文, 徐渝, 何正文,等, 项目调度中的时间/费用权衡问题研究综述 [J]. 管理工程学报,2007,21(1):9297. |