• 中国计算机学会会刊
  • 中国科技核心期刊
  • 中文核心期刊

J4 ›› 2014, Vol. 36 ›› Issue (02): 347-353.

• 论文 • 上一篇    下一篇

基于改进型批决策与调度建模的生产计划调度系统的研究

花季伟1,李晓婷2   

  1. (1.天津师范大学计算机与信息工程学院,天津 300074;2.河北省新闻出版广电监管中心局,河北 石家庄 050031)
  • 收稿日期:2012-07-21 修回日期:2012-11-23 出版日期:2014-02-25 发布日期:2014-02-25
  • 基金资助:

    河北省基础研究重点项目(09963536D);天津市高等学校科技发展基金计划项目(20120814);天津师范大学博士基金资助项目(52XB1001,52X09013)

Study of production planning and scheduling system based on batch decision-making and scheduling model          

HUA Jiwei1,LI Xiaoting2   

  1. (1.College of Computer and Information Engineering,Tianjin Normal University,Tianjin 300074;
    2.Hebei Press Publication Radio Film and Television Bureau,Supervision Center,Shijiazhuang 050031,China)
  • Received:2012-07-21 Revised:2012-11-23 Online:2014-02-25 Published:2014-02-25

摘要:

热轧型钢生产工艺复杂,其生产中极易出现由于计划调度安排不当而产生的交货期延误、库存超负荷等问题。针对以上问题研究设计了MES生产计划调度系统,改进了批决策调度策略用于数学建模,利用自适应遗传算法求解生产调度计划。以此为基础,为某热轧企业设计实现了生产计划调度系统,并通过真实的热轧型钢订单、原料、设备等数据,对模型改进前后的计划编制方法进行模拟与比较,验证了利用该改进型批决策与调度模型编制的热轧型钢生产调度计划可节省生产时间、降低设备调度时间,以此来指导热轧型钢的生产可切实减少交货延误和减少库存占用率,并提高企业利润率。

关键词: 生产计划与调度, 热轧型钢, 批决策与调度, 遗传算法

Abstract:

Due to the complexity of the hot rolled section steel production process, some problems such as delivery delay and overload inventory appear easily, which are induced by improper planning and scheduling. Aiming at these problems, the MES production planning and scheduling system is studied and designed. A mathematical model is formulated based on the improved batch decisionmaking and scheduling strategy. And the production scheduling plan is solved with selfadaptive genetic algorithm. Based on these theories, a production planning and scheduling system for a hotrolled enterprise is designed and implemented. Through the real hot rolled steel’s orders data, raw materials data, equipment data and so on, the planning methods of using new batch decisionmaking and scheduling strategy model and old ones are simulated and compared. It is improved that the solution of batch decision-making and scheduling model is able to save production time, reduce the times of equipment scheduling. Using this plan to direct production activities can reduce the times of delay in delivery, reduce inventory occupancy rate and improve enterprise profit margin.