[1] |
LI Wen-jia, SHI Lan, JI Hang-xu, LUO Yi-peng.
Research and implementation of a Flink-oriented load balancing task scheduling algorithm
[J]. Computer Engineering & Science, 2022, 44(07): 1141-1151.
|
[2] |
JI You-lang, ZHU Jun, ZOU Yun-feng, ZHOU Zi-xin, CHEN Xing.
A scheduling algorithm for online customer service system
[J]. Computer Engineering & Science, 2020, 42(12): 2242-2251.
|
[3] |
GUAN Chuanjiang, LI Jianpeng, SHI Guozhen, MAO Ming.
A cloud cipher job stream scheduling algorithm based on associated data localization
[J]. Computer Engineering & Science, 2020, 42(11): 1988-1995.
|
[4] |
PENG Jin-tao1,YANG Zhang1,2,LIU Qing-kai1,2,ZHANG Qian1.
A communication scheduling method combining
communication rearrangement and message merging
[J]. Computer Engineering & Science, 2020, 42(02): 191-196.
|
[5] |
LI Ke-wu,ZHANG Gong-xuan,ZHU Zhao-meng.
A decomposition-based multi-objective workflow scheduling algorithm in cloud environment
[J]. Computer Engineering & Science, 2016, 38(08): 1588-1594.
|
[6] |
QIN Bo1,ZHU Yong1,QIN Xue2.
Tide-bound water level computing and
visualization platform based on Spark
[J]. J4, 2015, 37(12): 2216-2221.
|
[7] |
TAN Ming.
Research on real-time messages transmission
scheduling over master-slave-based multi-switch Ethernet
[J]. J4, 2015, 37(10): 1862-1868.
|
[8] |
DING Xiaobo1,2,MA Zhong1,3,DAI Xinfa3,HUANG Weihua3.
A novel soft real-time VM scheduling algorithm
based on resource pre-allocation
[J]. J4, 2015, 37(05): 865-872.
|
[9] |
WAN Cong,WANG Cuirong,WANG Cong,L Yanxia,JIA Shuo.
A MapReduce scheduling algorithm supporting
multiple priorities based on queuing network
[J]. J4, 2014, 36(12): 2286-2295.
|
[10] |
QIAO Fu.
A tasks scheduling algorithm for grid
computing based on fuzzy multi-objective
[J]. J4, 2014, 36(09): 1644-1649.
|
[11] |
LUO Jie,CHEN Yueyue,SUN Haiyan,YANG Liu,DAN Xiaoqiang,XIN Naijun,WANG Ji.
Implementation of instruction scheduling algorithm
based on list scheduling for Matrix DSP
[J]. J4, 2013, 35(8): 25-30.
|
[12] |
LI Kun1,JIANG Lili2.
Research of the Astarbased workflow scheduling
advanced algorithm for distributed computing
[J]. J4, 2013, 35(3): 38-42.
|
[13] |
BAN Dongsong1,YANG Wei2,SONG Lei3,JIANG Jie3,DOU Wenhua3.
Scheduling Algorithms for Barrier Coverage to Maximize Network Life Time
[J]. J4, 2012, 34(12): 16-21.
|
[14] |
ZHU Chunling,LI Qinghua,PAN Jun.
A TrustBased Scheduling Algorithm in the Economic Model Grid
[J]. J4, 2010, 32(4): 86-89.
|
[15] |
JIAO Ge1,2,LI Renfa2,PENG Riguang2,LI Lang1,2,ZOU Yi1.
A RealTime Task Scheduling Algorithm for Dynamic Reconfigurable Systems
[J]. J4, 2010, 32(12): 145-148.
|