MultiDimensional Modeling and Simulation in SBA

Expand
  • (Institute of System Engineering,Huazhong University of Science and Technology,Wuhan 430074,China)

Received date: 2010-03-10

  Revised date: 2010-07-03

  Online published: 2011-03-25

Abstract

Using modeling and simulation as tools, Simulation Based Acquisition(SBA) is a comprehensive demonstration of acquisition's scheduling, cost, performance, etc. The key points include the consistency of complicated information mapping, parallelization and evolution of dynamic multidimensional simulation. Against the background of missile acquisition, the methods of multidimensional modeling and simulation in SBA are  studied. A multiscale work breakdown structure(WBS), which consists of domain decomposition, task/subtask decomposition and resource decomposition, is  designed as a basis, and the information from different dimensions is mapped to WBS consistently. After the construction of taskrelation models and attributeassociation models, and using performance as the condition of loop iteration, the simulation process is carried out dynamically and in parallel, with a taskscheduling/timeadvancing/ dimensionparalelizing mechanism. And the methods for the evaluation of acquisition risk to meet the complicated requirements with comprehensive constraints from the dimensions of scheduling, cost, performance, etc., are proposed to support acquisition decisionmaking.

Cite this article

BAI Yongjun,CHEN Yang,ZHAO Yong . MultiDimensional Modeling and Simulation in SBA[J]. Computer Engineering & Science, 2011 , 33(3) : 119 -128 . DOI: 10.3969/j.issn.1007130X.2011.

References

[1]Chen P H. Integration of Cost and Schedule Using Extensive Matrix Method and Spreadsheets[J]. Automation in Construction, 2008, 18(1):3241.
[2]Lee H S, Yi K J. Application of Mathematical Matrix to Integrate Project Schedule and Cost[J]. Journal of Construction Engineering and Management, 1999, 125(5):339346.
[3]Isidore L J, Back W E.Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration[J]. Journal of Construction Engineering and Management, 2002, 128(3):211219.
[4]Carr R I. Cost, Schedule, and Time Variances and Integration [J]. Journal of Construction Engineering and Management, 1993, 119(2):245265.
[5]Barraza G A, Back W E, Mata F. Probabilistic Monitoring of Project Performance Using SScurves[J]. Journal of Construction Engineering and Management, 2000, 126(2):142148.
[6]Barraza G A, Back W E, Mata F. Probabilistic Forecasting of Project Performance Using Stochastic S Curves[J]. Journal of Construction Engineering and Management, 2004, 130(1):2532.
[7]Poh Y P, Tah J H. Integrated DurationCost Influence Network for Modeling Risk Impacts on Construction Tasks[J]. Construction Management and Economics, 2006, 24(8):861868.
[8]徐哲, 吴瑾瑾, 贾子君. 基于概率联合分布的费用与进度联合风险估计[J]. 系统工程学报, 2009, 24(1):4653.
[9]徐哲, 吴瑾瑾, 姚李刚. 基于GERT仿真的武器装备技术风险量化评估模型[J]. 系统仿真学报, 2008, 20(7):16551664.
[10]张汉鹏, 邱菀华. 基于DSM优化的产品开发两因素风险建模及仿真[J]. 北京航空航天大学学报, 2007, 33(5):627630.
[11]武照云. 复杂产品开发过程规划理论与方法研究:[博士学位论文][D]. 合肥: 合肥工业大学, 2009.

Outlines

/