Impact of “one testing after multiple bondings” on the testing process  in  “mid-bond tests”   

QIN Zhen-lu1,2,FANG Fang1,WANG Wei1,2,ZHU Xia1,2,GUO Er-hui3,REN Fu-ji1,2   

  1. (1.School of Computer and Information,HeFei University of Technology,Hefei 230009;
    2.Anhui Province Key Laboratory of Affective Computing and Advanced
    Intelligent Machine,Hefei University of Technology,Hefei 230009;
    3.The 38th Research Institute,China Electronics Technology Group Corporation,Hefei 230009,China)
  • Received:2016-04-15 Revised:2016-06-19 Online:2016-08-25 Published:2016-08-25

Abstract:

With the continuous development of semiconductor technology, 3D chip technology has become a hot research highlight, and the process of chip testing has a new requirement for “mid-bond tests”. But for the “mid-bond test”, “one testing after every bonding” makes some dies repeat testing, thus resulting in an increase of test time. We put forward a "one testing after multiple bondings" testing process which considers the effect of test power consumption and "theoretical manufacturing cost". Besides, we also introduce a breadth first traversal algorithm, which combines the relevant parameters of ITC'02 circuit. The combination reflects our proposal's practical significance in actual production.

Key words: mid-bond test, one testing after multiple bondings, power constrains, theoretical manufacturing cost constrains