Computer Engineering & Science
Previous Articles Next Articles
Received:
2019-10-08
Revised:
2020-02-07
Online:
2020-06-25
Published:
2020-06-25
ZHANG Ce1,YI Wen-min2,BAI Rui1,SHENG Sheng1,XU Zao-hui1,GAO Tian-yi1,WANG Kan-yu1,SU Jia-yao1. Utility and verification of failure data set in SRGM[J]. Computer Engineering & Science.
[1] | Dohi T, Matsuoka T, Osaki S.An infinite server queuing model for assessment of the software reliability[J]. |
Electro- nics and Communications in Japan (Part III:Fundamental Electronic Science),2002,85(3):43-51. | |
[2] | Yamada S,Ichimori T,Nishiwaki M.Optimal allocation policies for testing-resource based on a software reliability growth model[J].Mathematical and Computer Modelling,1995,22(10/11/12):295-301. |
[3] | Princy B A,Sridhar S.Measuring software reliability and release time using SRGM tool[J].International Journal of Scientific Research and Education,2014,2(5):785-796. |
[4] | Goel A L,Okumoto K.Time-dependent error-detection rate model for software reliability and other performance mea- sures[J].IEEE Transactions on Reliability,1979,R-28(3):206-211. |
[5] | Ahmad N,Khan M G M,Rafi L S.A study of testing-effort dependent inflection S-shaped software reliability growth models with imperfect debugging[J].International Journal of Quality & Reliability Management,2010,27(1):89-110. |
[6] | Zhang Ce, Meng Fan-chao, Kao Yong-gui,et al.Survey of software reliability growth model[J].Journal of Software,2017,28(9):2402-2430. (in Chinese) |
[7] | Zhang Ce,Cui Gang,Liu Hong-wei,et al.Component-based software reliability process technologies[J].Chinese Journal of Computer,2014,37(12):2586-2612.(in Chinese) |
[8] | Zhang C,Cui G,Meng F C,et al.A study of optimal release policy for SRGM with imperfect debugging[J].Journal of Engineering Science and Technology Review,2013,6(3):111-118. |
[9] | Huang C Y. Performance analysis of software reliability growth models with testing-effort and change-point[J].Journal of Systems and Software,2005,76(2):181-194. |
[10] | Huang C Y. Cost-reliability-optimal release policy for software reliability models incorporating improvements in testing efficiency[J].Journal of Systems and Software,2005,77(2):139-155. |
[11] | Bokhari M U,Ahmad N.Incorporating burr type XII testing-efforts into software reliability growth modeling and actual data analysis with applications[J].Journal of Software,2014,9(6):1389-1400. |
[12] | Ohba M,Chou X M.Does imperfect debugging affect software reliability growth?[C]∥Proc of the 11th Internatio- nal Conference on Software Engineering,1989:237-244. |
[13] | Ohba M.Software reliability analysis models[J].IBM Journal of Research and Development,1984,28(4):428-443. |
[14] | Wood A. Predicting software reliability[J].Computer,1996,29(11):69-77. |
[15] | Musa J D, Iannino A,Okumoto K.Software reliability:Measurement,prediction,application[M].New York:McGraw Hill,1987. |
[16] | Pham H. Software reliability[M].Singapore:Springer,2000. |
[17] | Ehrlich W,Prasanna B,Stampfel J,et al.Determining the cost of a stop-test decision [J].IEEE Software,1993,10(2):33-42. |
[18] | Stringfellow C,Andrews A A.An empirical method for selecting software reliability growth models[J].Empirical Software Engineering,2002,7(4):319-343. |
[19] | Misra P N.Software reliability analysis[J].IBM Systems Journal,1983,22(3):262-270. |
[20] | Hossain S A, Dahiya R C.Estimating the parameters of a non-homogeneous Poisson-process model for software reliability[J]. |
IEEE Transactions on Reliability,1993,42(4):604-612. | |
[21] | Rothermel G, Untch R H, Chu C, et al.Prioritizing test cases for regression testing[J].IEEE Transactions on Software Engineering,2001,27(10):929-948. |
[22] | Zhang X,Pham H.Software field failure rate prediction before software deployment[J].Journal of Systems and Software,2006,79(3):291-300. |
[23] | Pham H.Software reliability and cost models:Perspectives,comparison,and practice[J].European Journal of Operatio- nal Research,2003,149(3):475-489. |
[24] | Gopalakrishna R,Spafford E,Vitek J.Vulnerability likelihood:A probabilistic approach to software assurance CERIAS,Tech Report 2005-06 |
[R] | West Lafayette:Purdue Univesity, 2005. |
[25] | Yamada S,Tokuno K,Osaki S.Imperfect debugging models with fault introduction rate for software reliability assessment[J].International Journal of Systems Science,1992,23(12):2241-2252. |
[26] | Zhang X,Teng X,Pham H.Considering fault removal efficiency in software reliability assessment[J].IEEE Transactions on Systems,Man and Cybernetics,Part A:Systems and Humans,2003,33(1):114-120. |
[27] | Pham H.System software reliability[M].London:Springer,2007. |
[28] | Pham H,Zhang X.NHPP software reliability and cost mo- dels with testing coverage[J].European Journal of Operational Research,2003,145(2):443-454. |
[29] | Xie Jing-yan,An Jin-xia,Zhu Ji-hong.NHPP software reliability growth model considering imperfect debugging[J].Journal of Software,2010,21(5):942-949.(in Chinese) |
[30] | Huang C Y,Hung T Y.Software reliability analysis and assessment using queuing models with multiple change-points[J].Computers & Mathematics with Applications,2010,60(7):2015-2030. |
[31] | Huang C Y,Lyu M R.Optimal release time for software systems considering cost,testing-effort,and test efficiency[J].IEEE Transactions on Reliability,2005,54(4):583-591. |
[32] | Huang C Y, Lyu M R. Estimation and analysis of some generalized multiple change-point software reliability models[J].IEEE Transactions on Reliability,2011,60(2):498-514. |
[33] | Shyur H J. A stochastic software reliability model with imperfect-debugging and change-point[J].Journal of Systems and Software,2003,66(2):135-141. |
附中文参考文献: | |
[6] | 张策,孟凡超,考永贵,等.软件可靠性增长模型研究综述[J].软件学报,2017,28(9):2402-2430. |
[7] | 张策,崔刚,刘宏伟,等.构件软件可靠性过程技术[J].计算机学报,2014,37(12):2586-2612. |
[29] | 谢景燕,安金霞,朱纪洪.考虑不完美排错情况的NHPP 类软件可靠性增长模型[J].软件学报,2010,21(5):942-949. |
[1] | WANG Yu-zhuo, LIU Hai-tao, YUAN Hao-jie, ZHANG Zhi-hua. A method for determining weak components of component-based software system [J]. Computer Engineering & Science, 2023, 45(04): 630-637. |
[2] |
PU Rong, SHAO Jian-fei, HU Chang-li, QU Kun.
A vertical mining algorithm for high average-utility
itemsets based on optimal upper bound
[J]. Computer Engineering & Science, 2020, 42(05): 931-937.
|
[3] |
HE Deng-ping1,2,3,HE Zong-hao1,2,LI Pei-qiang1,2.
A parallelhigh utility itemset mining
algorithm based on Spark
|
[4] | HE Dengping1,2,3,HE Zonghao1,2. A top-k high utility itemset mining algorithm based on R-list [J]. Computer Engineering & Science, 2019, 41(07): 1318-1324. |
[5] | YANG Gaoming1,FANG Xianjin1,LU Kui1,WANG Jing2. Privacy preserving method for dataset with function dependence [J]. J4, 2015, 37(11): 2154-2161. |
[6] | SONG Wei,JI Honglei,LI Jinhong. A parallel algorithm for mining high utility itemsets [J]. J4, 2015, 37(03): 422-428. |
[7] |
YAO Zhifeng1,2,YE Xiufen2,DAI Xuefeng1,ZHU Ling1,SUN Ming1.
A benefit based collision avoidance strategy for multi-robot systems [J]. J4, 2014, 36(07): 1324-1329. |
[8] | LIU Juefu,CHEN Xiao. Research on dynamic spectrum allocation algorithm based on spatial congestion games with adaptive load balancing [J]. J4, 2013, 35(7): 64-70. |
[9] | ZHANG Wangxun,HOU Hongtao,WANG Weiping. Research on GNSS’s securityprotection [J]. J4, 2013, 35(4): 65-69. |
[10] | LIU Yutao1,2,SONG Zhiqun1,TAN Xuezhi2. Spectrum Allocation Algorithm Based on Maximum Weighted Independent Set [J]. J4, 2012, 34(6): 158-162. |
[11] | PENG Lihong,ZHANG Heying,JIANG Xinwen,DOU Wenhua. Development of a PriceBased Congestion Control Model [J]. J4, 2011, 33(2): 7-11. |
[12] | YE Ying-Ze, ZHANG Ying. A New Distributed Algorithm to Achieve Utility MaxMin Fairness [J]. J4, 2010, 32(4): 10-13. |
[13] | WANG Xin-Wei, JU Rong-Zhu, HUANG Min. A Flexible QoS Unicast Routing Scheme Based on Utility and QGA [J]. J4, 2010, 32(2): 1-3. |
[14] | ZHANG Yang, HE Li-Yuan, XIE Ying-Ze. esearch on the Efficiency and Fairness Issues in Bandwidth Allocation [J]. J4, 2010, 32(2): 4-6. |
[15] | . [J]. J4, 2008, 30(9): 93-95. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
湘公网安备 43010502000083号
湘ICP备10006030号
Copyright © Computer Engineering & Science, All Rights Reserved.
Address:109 Deya Rd,Changsha,hunan(410073) Tel: 0731-87002567 Email: jsjgcykx@vip.163.com
Powered by Beijing Magtech Co., Ltd.