[1] |
Molka D,Hackenberg D,Schoene R,et al.Flexible workload generation for HPC cluster efficiency benchmarking[J].Computer Science—Research and Development,2012,27(4):235-243.
|
[2] |
Mukherjee T, Banerjee A,Varsamopoulos G,et al.Spatio-temporal thermal-aware job scheduling to minimize energy consumption in virtualized heterogeneous data centers[J].Computer Networks,2009,53(17):2888-2904.
|
[3] |
Tsafrir D,Feitelson D G.Instability in parallel job scheduling simulation:The role of workload flurries[C]∥Proc of the 20th IEEE International Parallel & Distributed Processing Symposium,2006:1.
|
[4] |
Yuan Y,Wu Y,Zheng W,et al.Guarantee strict fairness and utilize prediction better in parallel job scheduling[J].IEEE Transactions on Parallel & Distributed Systems,2014,25(4):971-981.
|
[5] |
Tsafrir D,Etsion Y,Feitelson D G.Backfilling using system-generated predictions rather than user runtime estimates[J].IEEE Transactions on Parallel & Distributed Systems,2007,18(6):789-803.
|
[6] |
Chiang S H,Arpaci-Dusseau A,Vernon M K.The impact of more accurate requested runtimes on production job schedul- ing performance[C]∥Proc of Workshop on Job Scheduling Strategies for Parallel Processing,2002:103-127.
|
[7] |
Gaussier E,Glesser D,Reis V,et al.Improving backfilling by using machine learning to predict running times[C]∥Proc of the International Conference for High Performance Comput- ing,Networking,Storage and Analysis,2015:1-10.
|
[8] |
Tong Y,Chen L,Ding B.Discovering threshold-based frequent closed itemsets over probabilistic data[C]∥Proc of 2012 IEEE 28th International Conference on Data Engineering,2012:270-281.
|
[9] |
Ramírez-Alcaraz J M, Tchernykh A,Yahyapour R,et al.Job allocation strategies with user run time estimates for online scheduling in hierarchical grids[J].Journal of Grid Comput- ing,2011,9(1):95-116.
|
[10] |
Park J W,Kim E.Runtime prediction of parallel applications with workload-aware clustering[J].Journal of Supercomputing,2017,73(3):1-17.
|
[11] |
Cunha R L F,Rodrigues E R,Tizzei L P,et al.Job placement advisor based on turnaround predictions for HPC hybrid clouds[J].Future Generation Computer Systems,2017,67:35-46.
|
[12] |
Wu Gui-bao, Shen Yu,Zhang Wen-shuai,et al.Runtime prediction of jobs for backfilling optimization[J].Journal of Chinese Computer Systems,2019,40(1):6-12.(in Chinese)
|
[13] |
Xiao Yong-hao, Xu Lun-fan, Xiong Min.GA-Sim:A job running time prediction algorithm based on categorization and instance learning[J].Computer Engineering & Science,2019,41(6):987-992.(in Chinese)
|
[14] |
Naghshnejad M,Singhal M.A hybrid scheduling platform:A runtime prediction reliability aware scheduling platform to improve HPC scheduling performance[J].The Journal of Supercomputing,2020,76:112-149.
|
[15] |
Savin G I,Shabanov B M,Nikolaev D S,et al.Jobs runtime forecast for JSCC RAS supercomputers using machine learning methods[J].Lobachevskii Journal of Mathematics,2020,41(12):2593-2602.
|
[16] |
Wyatt Ⅱ M R, Herbein S, Gamblin T, et al.PRIONN:Predicting runtime and IO using neural networks[C]∥Proc of the 47th International Conference on Parallel Processing,2018:46:1-46:12.
|
[17] |
Feitelson D G,Tsafrir D,Krakov D.Experience with using the parallel workloads archive[J].Journal of Parallel & Distributed Computing,2014,74(10):2967-2982.
|
[18] |
Carvalho M,Brasileiro F.A user-based model of grid computing workloads[C]∥Proc of 2012 ACM/IEEE 13th International Conference on Grid Computing,2012:40-48.
|
[19] |
Iosup A,Epema D.Grid computing workloads[J].IEEE Internet Computing,2010,15(2):19-26.
|
[20] |
Zoubi M B A,Rawi M.An efficient approach for computing silhouette coefficients[J].Journal of Computer Science,2008,4(3):252-255.
|
[21] |
Chen X,Zhang H,Bai H,et al.Runtime prediction of high-performance computing jobs based on ensemble learning[C]∥Proc of 2020 4th International Conference on High Performance Compilation,Computing and Communications,2020:56-62.
|
[22] |
Chung J Y, Gulcehre C, Cho K, et al.Gated feedback recurrent neural networks[C]∥Proc of International Conference on Machine Learning,2015:2067-2075.
|
[23] |
Hochreiter S,Schmidhuber J.Long short-term memory[J].Neural Computation,1997,9(8):1735-1780.
|
[24] |
Azam M F, Younis S.Multi-horizon electricity load and price forecasting using an interpretable multi-head self- attention and EEMD-based framework[J].IEEE Access,2021,9:85918-85932.
|
[25] |
Vaswani A,Shazeer N,Parmar N,et al.Attention is all you need[C]∥Proc of the 31st International Conference on Neural Information Processing Systems,2017:6000-6010.
|
[26] |
Huang S T, Wang D L, Wu X H, et al. DSANet:Dual self-attention network for multivariate time series forecasting[C]∥Proc of the 28th ACM International Conference on Information and Knowledge Management,2019:2129-2132.
|
[27] |
Kingma D P,Ba J.Adam:A method for stochastic optimization[J].arXiv:1412.6980,2014.
|
[28] |
Srivastava N, Hinton G,Krizhevsky A,et al.Dropout:A simple way to prevent neural networks from overfitting[J].The Journal of Machine Learning Research,2014,15(1):1929-1958.
|
[29] |
Meyer G P.An alternative probabilistic interpretation of the huber loss[J].arXiv:1911.02088,2019.
|
|
附中文参考文献:
|
[12] |
吴桂宝,沈瑜,张文帅,等.面向回填优化的作业时长预测[J].小型微型计算机系统,2019,40(1):6-12.
|
[13] |
肖永浩,许伦凡,熊敏.GA-Sim:一种基于分类和实例学习相结合的作业运行时间预测算法[J].计算机工程与科学,2019,41(6):987-992.
|